Data centre developers

Data centres need to move fast, and your scheduling teams struggle to keep up. Planlab’s AI coworkers update schedules in hours when grid dates, equipment slots or tenant needs move, assure contractor schedules as they arrive, and find the optimal way forward on ready-for-service date and cost.

From issue to decision in days, not a month.

Book a call

Problems Planlab solves

Constant change

Grid dates, equipment slots and tenant needs change every week.

Hard trade-offs

Every decision is a trade-off across time, equipment and labour.

Hidden risks

You can’t see the risks or opportunities that are hidden in your contractors’ programmes.

Schedulers should focus on keeping the project on track, not on manual edits and reports

1

Update: schedules that keep up. Update schedules in hours when grid dates, equipment slots or tenant needs move. Run scenarios to make the best call for the project, such as the right power solution.

2

Optimise: find the optimal path. Model delay penalties, power, equipment and labour constraints together, and compare options on ready-for-service date and cost.

3

Visibility: spot problems early. Contractor schedules are assured and integrated as they arrive, so issues surface early and you see the levers to mitigate delays or accelerate completion.

Our coworkers can execute end-to-end workflows

Assure and integrate contractor schedules

You ask

Here are this month’s schedule updates from the GC, electrical and mechanical contractors. Assure them, flag what we should challenge and update our integrated master.

The AI coworker then
  1. Reads each contractor’s schedule update as it arrives
  2. Assures it: logic, float, constraints incl. DCMA 14-point checks
  3. Flags changes to challenge: logic, durations, equipment dates
  4. Integrates the updates into the master, saved as a new version
  5. Shows the knock-on to each building’s ready-for-service date

Done, ready for your review

Find the optimal way forward

You ask

We’ve just had an update from the utility: the grid connection is now expected on 5 May 2028. Find the best power option now, including any modification works it needs.

The AI coworker then
  1. Reads the utility update: grid now expected 5 May 2028
  2. Re-runs grid only, gas turbines and bridge power
  3. Adds the modification works each power route needs
  4. Grid only: Building 1 is ready for service on 27 Oct 2028
  5. Bridge power, then grid: ready 6 Dec 2027, the earliest

Done, ready for your review

Fix contractor clashes before they reach site

You ask

Check the next three months for clashes between contractors on site, and find a sequence with no clashes that keeps our ready-for-service dates.

The AI coworker then
  1. Plays every contractor’s schedule over the site, day by day
  2. Finds 20 clashes: trades in the same zone at the same time
  3. Tests resequenced options until no clashes are left
  4. Recommends the clash-free sequence that holds the key dates

Done, ready for your review

Stay ahead of resource constraints

You ask

Do we have enough specialist labour to deliver all three buildings? If not, what does it cost us and what are our options?

The AI coworker then
  1. Totals demand for each trade across every contractor
  2. Flags where demand exceeds the labour available
  3. Levels the schedule to those limits and shows which dates move
  4. Calculates the time and cost impact of levelling
  5. Tests mitigations: resequencing, extra shifts, prefabrication

Done, ready for your review

Case study: 6 EPCMs, $9bn project

Before

Slow, fragmented decisions

  • Updating and integrating takes months
  • Low-quality, siloed reports
  • Time dominated by repetitive tasks
  • Once an issue is visible, the damage is done
Update cycle
2 months
Cross-functional clashes
100/month
Now

Fast, integrated decisions

  • Agents run updates in real time
  • Immediate cross-functional visibility
  • Teams freed up to think and analyse
  • Problems caught early and small
Update cycle
1 week
Cross-functional clashes
40/month
Impact

90%reduction in time to action

50%reduction in time and cost overruns

Trusted by industry leaders

Projects slip because of slow decisions on old, bad data.

Get In Touch
This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media.